Leveling the floor by the temp stairs.
|
First floor joist.
|
No contact to the trailer here.
|
The other end.
|
Bits and pieces.
|
Bamboo plastic support.
|
My cedar tree.
|
Attached.
|
Joists and some decking in.
|
A better view of the tree.
|
And its top.
|
Finished plastering the inside. For now anyway.
|
Most of the second floor decking in place
|
Temp supports.
|
Going up.
|
Stove base. No pix of the base but this is beer bottles stood on the neck as closely packed as I could get them then cement mixed and poured over then wire and more cement.
|
This wall will come out when the enclosure is done. The part seen here is in what will be the greenhouse.
|
Rock from the dry lake bed and cedar thicket.
|
More materials.
|
Second floor starting to go up. Back wall winterized on first floor.
|
Our new kitchen drawers.
|
Growing right into the door frame.
|
wire overlaping block. will fill holes with cans and broken glass and cement.
|
Filling the holes.
|
Big limestone rock. Sucker was heavy.
|
Added 4 feet to the flue to get the smoke higher than the new roof line.
|
Time has passed and the rain is done for a short while. Walls and roof are starting to go up.
|
Sawzall and wood mizer blade make short work of cutting this stuff.
|
South wall.
|
South west corner
|